ILLUSTRATIVE CASE FILE
Tandem Logistics Depot
A charging rollout sequenced around staggered vehicle returns and active loading bays.
Concept photograph of two delivery vans near charging pedestals outside a distribution depot
CAPABILITY
Fleet charging
FACILITY TYPE
Distribution
EXAMPLE PHASE
Concept design
The working constraint
Preserve vehicle turning paths and keep loading bays available at shift changes.
The design decision
Start with overnight vehicles and reserve a clear path for the second phase.
How the work is sequenced
The sample depot handles a mix of overnight and short dwell vehicles. The concept maps the charging sequence to the real parking pattern and gives the operations team a way to challenge assumptions before civil work begins. The next phase has a defined trigger based on vehicle allocation and confirmed service capacity.
What the owner receives
A phased parking plan, operating assumptions and the information needed for a utility review.
PROJECT INTAKE / 01
Start with the site you have.
Turn the first conversation into a brief your team can use.
