FIELD NOTE

Make the outage window a design input

How site schedules can shape an upgrade before equipment is selected.

Ask about recovery as well as downtime

Some operations need time to restart, stabilize or confirm a safe handover. Capture those steps alongside the available shutdown window so the plan reflects the whole interruption.

Separate assumptions from approvals

Document provisional assumptions and assign someone to verify each one. Coordinate with the owner, operators and qualified design team before treating a proposed cutover sequence as approved.

Agree on what makes a handover complete

Decide which checks, records and sign-offs belong in the handover. Put the sequence in front of the people who will use it before a date is locked in.

PROJECT INTAKE / 01

Start with the site you have.

Turn the first conversation into a brief your team can use.

Create a free website with Framer, the website builder loved by startups, designers and agencies.